![]() ![]() | ||
|
PLEASE NOTE: This page is designed to provide the reader with an historical perspective of what has transpired at Facilities Committee Meetings devoted to the discussion of the new Bethel Park High School Project. Details of the project, including statistics, costs, floor plans, etc. have changed over the course of these meetings, so the information you will read below does not accurately reflect the current status of the project. For the latest information packet, please click here. December 17, 2008 At this meeting, the architects presented updated floor plans and views of the main entrance. October 30, 2008 At this meeting, the architects presented updated aerial elevations and new drawings of the entrance, main lobby/student commons area, gymnasium, swimming pool, auditorium and band room.
October 8, 2008 At this meeting, the architects presented more detailed schematics for the Fine Arts Wing and the Cafeteria/Food Service Areas.
September 25, 2008 September 10, 2008 At this meeting, the Board also received updated aerial perspectives and Floor Plans for levels 2, 3 and 4.
August 28, 2008 At this meeting, the Board received updated aerial views.
July 30, 2008 At this meeting, the Board received an updated Schematic Design Plan, Composite Floor Plans and aerial views. Please click on the links below to see the latest design. We have removed the Academic Wing Views and Floor Plans that were shared at this meeting, because the most recent views are those under the August 28 meeting.
July 17, 2008 The Board held a Finance and a Facilities Committee Meeting this evening, to look at information on financing the high school project 20 or 25 years. Please click on the links below to see the handouts from this meeting. Following the Finance Committee Meeting, the Board held a Facilities Committee Meeting to decide on a design/location for the new high school building. The only drawing that changed is the Schematic Design Plan, which was modified for presentation at the July 30 meeting. The changes reflect keeping Purkey Field where it currently is and relocating the Student Parking Lot. The current Schematic Design Plan can be accessed by clicking on the link under the July 30, 2008 meeting above. July 2, 2008 Updated Information At this meeting the Board saw revised drawings and cost adjustments for the project. These are listed below. The gymnasium photo is from another high school, but would be similar to the one proposed for the new Bethel Park High School. Additional drawings were shown at this meeting but have been removed from this site to avoid any confusion, because they have changed.
June 4, 2008
May 21, 2008
February 20, 2008 At this meeting the district heard a presentation from the Architects, outlining three options for Bethel Park High School--renovating the existing buildings, building a new high school, or connecting buildings 5, 6 and 7. Because the schematic drawings have changed since this meeting, we have removed the links to avoid any confusion.
January 30, 2008
January 14, 2008
January 7, 2008
| ||
© 2004 Bethel Park School District. All rights reserved. |